🌐 NL · Last reviewed: 27 May 2026
Lot Correction and Lot Merge
Two administrative screens for correcting inventory at lot level. Both are key-user / admin tooling and post directly to the ledger — handle with care.
Lot Correction — writing off a specific lot
When a lot physically holds less than recorded (damage, scrap, count discrepancy), use Lot Correction. You can retain the original lot number or generate a new one.
Setup prerequisite
Before any user can post lot corrections, the User Setup must contain:
-
Lot Correction Template — Item Journal Template name (e.g. "LOT CORRECTION").
-
Lot Correction Template Batch — Batch name within that template (e.g. "DAILY").
Error if missing: "No Lot Correction Template Batch defined in User Setup."
Workflow
-
Open Lot Correction and pick a lot via Item No. and Lot No.. DXSteel populates profile, quality, current length/width/thickness, weight/length inventory and cost price.
-
Fill in the Quantity to correct. Cannot exceed available inventory.
-
Set Bin Code to one that exists in the current location.
-
Set Reason Code (optional but recommended for auditability).
-
Tick Retain Lot No. to keep the existing number, or leave it off to allocate a new number from the batch's No. Series.
-
Click Post (F9) or Post and Print Labels.
-
Confirmation: "The journal lines were successfully posted."
Lot Merge — combining multiple lots
To consolidate several smaller batches into one lot (after sorting, after partial deliveries), use Lot Merge. DXSteel posts negative adjustments on the source lots and a positive on the target — net inventory unchanged.
Irreversible: after Post, the Item Ledger Entries are final. Reversal requires a counter-correction or counter-merge. Verify carefully before posting.
Workflow
-
Open Lot Merge.
-
Select the source lots via the Select lots action (one or many).
-
Fill the target lot data: Item No., Profile, Quality, Variant, Bin, Quantity, Cost.
-
Optionally fill Heat No., Plate No., Internal Lot No. and any attribute values.
-
Tick Retain Lot No. to keep the first source's lot number.
-
Click Post or Post and Print Labels.
Best practices
Reason Code on every correction: even though it's optional, always set one. Audits and cost analyses become much easier.
Print labels immediately after a merge. A physical lot without updated label is a source of warehouse errors.
Retain Lot No. — not always default: for merges of fundamentally different source batches (different heat numbers, different vendors), traceability improves by allocating a fresh lot number.
Permissions
Rights for Lot Correction and Lot Merge sit in:
-
DMX Item Admin — full (correction + merge).
-
DMX Whse Admin — full.
-
DMX Full Access — full.
Regular warehouse users (DMX Whse User, DMX Item User) do not have access. See Roles and permissions.
[Screenshot: Lot Merge with source lots and target lot completed]